Verified Committable Capacity • development boundary

Determine what the facility can still promise.

Valor’s Physical-State Intelligence™ architecture evaluates whether a proposed compute commitment remains supportable across the physical states still compatible with current evidence, existing obligations, required recovery reserve and declared disturbances. It is not represented as a field-proven autonomous control platform.

Core doctrine

Reality First. Evidence Bounded. Recovery Reserved. Conclusions Expire.

The proposed architecture receives a defined commitment, reads the current physical and evidence state, applies existing obligations and declared disturbances, identifies the apparent binding constraint and returns a bounded determination with a validity horizon.

Capacity is not a permanent score. A proposed commitment either remains inside the set supported by current evidence and required recovery reserve, or it does not.

Concept Areas Under Development

  • Commitment-solvency evaluation
  • Recovery-reserve encumbrance
  • Binding-constraint identification
  • Joint obligation testing
  • State-bound evidence and validity horizons
  • Non-compensatory admissibility
  • Machine-checkable audit records
  • Requalification after evidence, topology or obligation changes
DefinedMathematical constitution, evidence model, state transitions and commercial evaluation.
In ProgressClaim development, prior-art review, simulation, interface prototyping and partner qualification.
Not Yet CompleteIndependent field validation, production deployment and certified integration.
Required NextCustomer data replay, controlled testing, HIL or a read-only pilot with qualified owners.
Decision architecture

One Determination Across Power, Cooling, Compute And Recovery.

The framework is designed to keep the proposed commitment, physical state, evidence quality, obligations and recovery reserve inside one auditable decision boundary.

01

Commitment Request

Define the workload, location, ramp, duration, topology and restart or recovery requirement.

02

Evidence State

Read available power, cooling, equipment, workload, topology, provenance, uncertainty and freshness evidence.

03

Obligations And Reserve

Apply existing commitments, declared disturbances, applicable limits and recovery capacity that must remain available.

04

Bounded Determination

Return the apparent binding constraint, remaining recovery margin, evidence limitations, finding and validity horizon.

Transition contract

Stale Evidence Cannot Keep A Prior Yes Alive.

The decision state changes when the evidence supporting it changes. Operator acknowledgment records awareness; it does not postpone expiration or preserve the prior finding.

Qualified

The finding remains eligible for reliance only while its evidence, conditions, obligations and validity horizon remain true.

Threshold Crossed

If required evidence becomes stale, contradictory or unavailable, the prior finding becomes Not Established / HOLD immediately.

Refresh And Re-Evaluate

New evidence, topology, obligations or workload conditions produce a new state-bound determination rather than reviving an expired one.

Read-only meaning: HOLD means Valor cannot support another commitment from the current evidence. It does not command, shut down or assume authority over customer equipment.
Audit architecture

One Authoritative Record. Controlled Views Of The Same Decision.

The operator screen, written evaluation and future API should not become competing opinions.

Authoritative Audit Record

Preserve the commitment identifier, evidence set, constraint, reserve, prior and new finding, threshold event, validity horizon and reevaluation status.

Controlled Projections

Show each audience only the information it needs while keeping every screen and interface traceable to the same underlying determination.

Current evidence boundary: Valor has defined architecture, patent-pending filings, controlled simulation evidence, a fixed-scope evaluation product and a software-first validation path. Valor does not claim an independent production deployment, field-proven savings, certified safety function or authority to operate customer equipment.
Commercial entry point

Test One Defined Commitment.

Begin with a $25,000 read-only Recoverable Capacity Evaluation using client-supplied evidence.